Stuccoed the building last week, finishing touches, not paint ready. Notice that the garage doors finally came, two out of the four installed. Need to make some adjustments on the hanging, but look great. Will be detailing the door jams in wrapped steel. 
The upper canopy, above the doors will be wrapped in steel, with the Hula's logo above and to the left. On the side wall(right in the photo), will have a wood and tile detail 10 ft. wide, going down the center of the wall. Oh, and do not worry, that original metal roof is getting a fresh coat of new paint, won't give the color away just yet. 